SIGNIFICANCE OF PROJECT MANAGEMENT SKILLS AND BALANCING OF MANAGERIAL CONFLICTS BETWEEN PROJECT STAKEHOLDERS

Authors

  • Joshua Allan Netto Jr PhD Aspirant, Limkokwing University of Creative Technology, Malaysia
  • Valliappan Raju Assoc. Prof. Dr. Valliappan Raju, Post Graduate Centre, Limkokwing University of Creative Technology, Malaysia

DOI:

https://doi.org/10.20319/pijss.2017.32.14701486

Keywords:

Project Management, Construction, Communication, Consultant, Stakeholder, Property, Management, Leadership

Abstract

As the business environment in the building and construction industry becomes increasingly competitive with a high importance on efficiency and productivity, it is significant for project management teams to develop the right skills and competencies to handle projects well in order to balance the differing-needs of their key stakeholders. The critical part is the subject of project stakeholder satisfaction that Weaver (2007, p. 20-21) mentions as the objective of project management, which links all the competencies of the project manager, the human management factor, and the importance of leading the project with the drive to achieve completion “as efficiently as possible, to the satisfaction of the project’s stakeholders. As a result, achieving key project stakeholder satisfaction appears mysterious due to the subjectivity of the defining success because project success is “perceived differently by different stakeholders” (Shokri-Ghasabeh & Kavousi-Chabok, 2009). The client on one hand, being the paymaster for the project measures success in terms of the delivery of value. The consultants, on the other hand, have a deep interest in their reputation as designers protect the interests and needs of their clients as their hired agent. The contractors, in contrast, often choose to participate in a project based on the client’s financial capabilities, and have interest to call the designs and the completeness of contract documents into question, since variations present opportunities to make additional profit, or to incur losses on the part of the contractor should these not be put forward. In view of this the leadership, management capabilities and communication skills of the project manager and the project management team is critical, which includes interpersonal skills through negotiations, expectations management, influencing problem solving and decision-making skills in order to delicately balance the needs and expectations of these stakeholders, complete the project, and gain acceptance of the deliverable to the stakeholder’s satisfaction at the close out of the project. This research paper studies and describes about the relationship between constructor, client and consultant in project management perspective.

References

Ansah, S. K. (2011). Causes and Effects of Delayed Payments by Clients on Construction Projects in Ghana. Journal of Construction Project Management and Innovation, 1(1), 27-45.

AXELOS Limited. (2009). Managing Successful Projects with PRINCE2. Norwich: TSO.

Azhari Azman, M. N., Dzulkalnine, N., Hamid, Z. A., Mohd Kamar, K. A., & Mohd Nawi, M. N. (2013). Payment Scenario in the Malaysian Construction Industry Prior to CIPAA. CIB World Building Congress 2013.

Azman, M. N., Dzulkalnine, N., Hamid, Z. A., Mohd Kamar, K. A., & Mohd Nawi, M. (2014). Payment Scenario in the Malaysian Construction Industry Prior to CIPAA. Jurnal Teknologi. https://doi.org/10.11113/jt.v70.2804

Chua, S. (2012). Study on the Issues of Construction Disputes in Malaysia and Singapore.

Construction Industry Development Board. (2000). CIDB Standard Form of Contract for Building Works 2000 Edition. Construction Industry Development Board.

Creswell, J. W. (2009). Research Design: Qualitative, Quantitative and Mixed Methods Approaches (3rd ed.). Thousand Oaks: SAGE Publications, Inc.

Creswell, J. W., & Plano Clark, V. L. (2011). Designing and Conducting Mixed Methods Research (2nd ed.). Thousand Oaks: Sage Publications, Inc.

Department of Statistics Malaysia, Official Portal. (2016, November 10th). Retrieved February 2nd, 2017, from Construction: https://www.dosm.gov.my/v1/index.php?r=column/ctwoByCat&parent_id=76&menu_id=OEY5SWtFSVVFVUpmUXEyaHppMVhEdz09

Friedlander, M. C. (2003, October). Risk Allocation in Design-Build Construction Projects.

Government of Malaysia. (2012). Construction Industry Payment and Adjudication Act 2012. Percetakan Malaysia Nasional Berhad.

Hassan, F., Samad, Z. A., Hassan, S., Che Mat, M., & Isnin, Z. (2009). Training the Construction Workforce: A Case Study of. 230-241.

Judi, S., & Rashid, R. (2010). Contractor's Right of Action For Late or Non-Payment by the Employer. Journal of Surveying, Construction and Property, 1(1).

Kadefors, A. (1999). Client-Contractor Relations: How Fairness Considerations and Interests Influence Contractor Variation Negotiations. Proceedings IGLC-7, 231-240.

Kadefors, A., Gerle, C., & Nyberg, L. (2001). Trust and Distrust in Temporary Client-Contractor Relations.

Koh, C. P. (2005). The Causes of Construction Dispote on Client Organizations. Faculty of Civil Engineering, University Teknologu Malaysia.

Mahmud, N. B. (2009). A Study of Effectiveness of Project Management Consultancy (PMC) Services.

Memon, A. H., Rahman, I. A., & Azis, A. A. (2012, March). Time and Cost Perfomance in Costruction Projects in Southern and Cenrtal Regions of Penisular Malaysia. International Journal of Advances in Applied Sciences (IJAAS), 1(1), 45-52.

Miles, D. (1996). Labour-Based Technology - A Review of Current Practice. Contracting in Employment Intensive Works.

Mohemad, R., Hamdan, A. R., Ali Othman, Z., & Mohamad Noor, N. (2010, March). Decision Support Systems (DSS) in Construction Tendering Processes. International Journal of Computer Science, 7(2), 35-45.

Muneera, E., Anuar, A., & Zulkiflee, A. S. (2014, April). Preparing Project Managers to Achieve Project Success - A Human Management Perspective. International Journal of Research in Management & Technology, 4(2), 104-110.

Munthiu, M.-C. (2009). The Buying Decision Process and Types of Buying Decision Behavior. Sibiu Alma Mater University Journals. Series A. Economic Sciences, 2(4), 27-33.

Ofori, G. (2010). Challenges of Construction Industries in Developing Countries: Lessons from Various Countries. Department of Building, National University of Singapore.

Omidvar, G., Jaryani, F., Abdul Samad, Z. b., Zafarghandi, S. F., & Nasab, S. S. (2011). A Proposed Framework for Project Managers' Competencies and Role of E-Portfolio to Meet These Competencies. International Journal of e-Education, e-Business, e-Management and e-Learning, 1(4), 311-321. https://doi.org/10.7763/IJEEEE.2011.V1.51

Oyeyipo, O. O., Odusami, K. T., Ojelabi, R. A., & Afolabi, A. O. (2016). Factors Affecting Contractor's Bidding Decision for Construction Projects in Nigeria. Journal of Construction in Developing Countries. https://doi.org/10.21315/jcdc2016.21.2.2

Pertubuhan Arkitek Malaysia. (2006). Agreement and Conditions of PAM Contract 2006 (Without Quantities).

Pinto, J. (2010). Project Management: Acheiving Competitive Advantage (2nd ed.). New Jersey: Pearson Education, Inc.

Project Management Institute. (2013). A Guide to the Project Management Body of Knowledge. Pennsylvania: Project Management Institue, Inc.

Rajoo, S. (2010). The Pam 2006 Standard Form of Building Contract - A Change in Risk Allocation. Malayan Law Journal.

Ramachandra, T. (2012). Construction Payment Delays and Losses: Perceptions of New Zealand. Proceedings PMI New Zealand Chapter 18th Annual Conference 2012: Concise Paper.

Roffeypark. (2015). Building Leadership Capability in the Construction Sector. White Paper.

Rugenyi, F. (2015, November). Assessment of the Triple Constraints in Projects in Nariobi: The Project Managers' Perspective. International Journal of Academic Research in Business and Social Sciences, 5(11). https://doi.org/10.6007/IJARBSS/v5-i11/1889

Sambasivan, M., & Yau, W. (2007). Causes and Effects of Delays in Malaysian Construction Industry. International Journal of Project Management(25), 517-526.

Shokri-Ghasabeh, M., & Kavousi-Chabok, K. (2009, August). Generic Project Success and Project Management Success Criteria and Factors: Literature Review and Survey. WSEAS Transactions on Business and Economics, 6(8), 456-468.

Suratkon, A. (2004). The Change in Roles of Architects and Quantity Surveyors from Conventional to Partnering Approach.

Takim, R., & Adnan, H. (2008, July). Analysis of Effectiveness Measures of Construction Project Success in Malaysia. Asian Social Science, 4(7), 74-91.

Thuraisingam, T. (2011). The Architect as Contract Administrator: A Legal Perspective. Malaysian Instutute of Architects, Northern Chapter.

Weaver, P. (2007). The Origins of Project Management. Fourth Annual PMI College of Sceduling Conference.

Zakaria, Z. b., Ismail, S. b., & Md Yusof, A. b. (2013, 34-41). An Overview of Comparison between Construction Contracts in Malaysia: The Roles and Responsibilities of Contract Administrator in Achieving Final Account Closing Success. Proceedings of the 2013 International Conference on Education and Educational Technologies, 34-41.

Zulkifli, U. Z., Zakaria, N., & Salleh, H. b. (2011, December). The Comparative Study of International Standard Form of Building Contract (FIDIC Condiitons of Contracts for Construction - The New Red Book 1999) and Malaysian's Standard Form of Building Contract (PWD203A). International Engineering Education Conference 2011.

Downloads

Published

2017-10-16

How to Cite

Netto, J., & Raju, V. (2017). SIGNIFICANCE OF PROJECT MANAGEMENT SKILLS AND BALANCING OF MANAGERIAL CONFLICTS BETWEEN PROJECT STAKEHOLDERS. PEOPLE: International Journal of Social Sciences, 3(2), 1470–1486. https://doi.org/10.20319/pijss.2017.32.14701486