A PROBABILITY ANALYSIS OF CONSTRUCTION PROJECT SCHEDULE USING RISK MANAGEMENT TOOL

Authors

  • A. L. Agarwal National Institute of Construction Management and Research, Pune, India
  • D. A. Mahajan National Institute of Construction Management and Research, Pune, India

DOI:

https://doi.org/10.20319/mijst.2017.31.104109

Keywords:

Construction Project, Probability Distributions, Project Schedule, Uncertainty

Abstract

The construction industry tumbled along with the other industry/sectors during the recent economic crash. Construction business could not regain thereafter and is still passing through a slowdown phase, resulting in time and cost overrun of many real estate as well as infrastructure projects. There are many theories, tool and techniques with software packages available in the market to analyze construction schedule. This study focuses on the construction project schedule and uncertainties associated with construction activities. The infrastructure construction project has been considered for the analysis of uncertainty on project activities affecting project duration and analysis is done using @RISK software. Different simulation results arising from three probability distribution functions are compiled. This study helps construction project managers to plan and prepare more realistic schedules for construction projects and document probable project completion date in the contract to avoid compensations or claims arising due to missing the planned schedule.

References

Ahsan, K. and Gunawan, I. (2010) ‘Analysis of cost and schedule performance of international development projects’. International Journal of Project Management, 28(1), 68-78. https://doi.org/10.1016/j.ijproman.2009.03.005

Assaf, S.A. and Al-Hejji, S. (2006) ‘Causes of delay in large construction projects’. International Journal of Project Management, 24, 349–357. https://doi.org/10.1016/j.ijproman.2005.11.010

George, F. Jergeas and Janaka, Ruwanpura (2010) ‘Why cost and schedule overruns on mega sand projects’. Practice Periodical on Structural Design and Construction, ASCE, Vol. 15, No 1, 1.

Iyer, K.C. and Jha, K.N. (2005) ‘Factors affecting cost performance: evidence from Indian construction projects’. International Journal of Project Management, 23, 283–295. https://doi.org/10.1016/j.ijproman.2004.10.003

Meena, V. and Babu, Suresh K. (2015) ‘Study on time delay analysis for construction project’. International Journal of Engineering Research and Technology (IJERT), 1076-1083.

Williams, T. (2003) ‘The contribution of mathematical modeling to the practice of project management’. IMA Journal of Managements, 14(1), p.3.

Yang, Jyh-Bin and Kao, Chih-Kuei (2009) ‘Review of delay analysis methods: A process based comparison’. The Open Construction and Building Technology Journal, 3, 81-89.https://doi.org/10.2174/1874836800903010081

Downloads

Published

2017-01-30

How to Cite

Agarwal, A. L., & Mahajan, D. A. (2017). A PROBABILITY ANALYSIS OF CONSTRUCTION PROJECT SCHEDULE USING RISK MANAGEMENT TOOL. MATTER: International Journal of Science and Technology, 3(1), 104–109. https://doi.org/10.20319/mijst.2017.31.104109