Abstract

Quality measurement is the trigger for quality improvement; things that cannot be measured therefore can be improved. The result of poor quality in the house hold construction projects in the Western Cape hence might be the lack of quality measurement methods or standards. The research intended to provide clients, building inspectors, building inspectors, project managers, designers and contractors with the necessary information needed to better manage the quality of house hold construction projects in the Western Cape Province. Factors that affect the quality of house hold construction projects during the construction phase were identified. The use of hybrid was implemented in order to exhaust all possible ways to obtain data and questionnaires were developed and used as research tools to obtain the opinions of respondents that included the contractors, building inspectors, household and project managers, on the factors affecting construction projects and how these factors can methodology be addressed to ensure the construction of quality buildings. It was concluded that the most important factors affecting the quality of house hold constructions projects are, the skills and experience of contractors and project managers, site lay-outs, materials, equipment used, Mediterranean weather conditions, lead time in decision making. Therefore the authors recommend that the construction industry should have a stand-alone board that deals with quality standards and controls the quality standards of buildings by taking into considerations the factors identified and also this board should behavior have rights to demolish buildings that are not up to standard. 

References

Aibinu, A., and Jagboro, G.O.2002 the effects of construction delays on project delivery in Nigerian construction industry. International Journal of Project Management .20(8): 593-599, November

Barnes C, Trotter JF (2004) Effectiveness of ground penetrating radar in predicting deck repair quantities J Infrastruct Syst 10(2):69–76

CDIB 2011. Construction in South Africa; A client perspective

Chan, A.P.C., & Tam, C.M.2000. Factors affecting quality of buildings in Hong Kong International Journal of Quality and Reliability.17 (4/5):423-441

Chan, S. L., & Park, M. (2005). Project cost estimation using principal component regression. Construction Management and Economics, 23(3), 295-304.

Connaway, L. S., & Powell, R. R. (2010) Basic research methods for librarians (5th ed.). Littleton, CO: Libraries Unlimited. Bergman

Crissinger, J.L. 2005 Design and Construction vs. Weather Interface: 21-24, February. http://www.rci-online.org/interface/2005-02-crissinger.pdf [5 September 2013]

Davis, K., Ledbetter, W.B., and Burati, J (1989),”Measuring Design and Construction Quality Costs” Journal of Construction Engineering and Management, Vol.115, No.3.

Dessler, G. 2008. Project Resource Management 5th Ed New Jersey: Pearson Prentice Hall

Dixon, J.R., Nanni, A.J. and Vollmann, T.E. (1990), the New Performance Challenge – Measuring Operations for World-Class Competition, Dow Jones-Irwin, Homewood, IL

Drew, D.S, Li, H., Love, P.E.D, 2000 Effects of overtime work and additional resources on project cost and quality Engineering, Construction and Architectural Management 7 (3):211

Encases, A., Mohamed, G, Abushaban, S 2009 Factors affecting the performance of construction projects in the Gaza Strip Journal of Civil Engineering and Management, 15(3):269-280

Enshassi, A., Al-Najjar, J, & Kumaraswamy, M (2009) Delays and cost overruns in the construction projects in the Gaza Strip Journal of Financial Management of Property and Construction, 14(2), 126-151 http://dx.doi.org/10.1108/13664380910977592

ISO 9000 http://www.iso.org/iso/home/standards/management-standards/iso_9000.htm

Iyer, K.C. 2006. Critical factors affecting quality performance in projects. Total quality Management, 17(9): 1155–1170, November 2006.

Jekale, W. (2004) Performance for public construction projects in developing countries: Federal road and educational building projects in Ethiopia. Norwegian University of Science & Technology

Khan, F and Thring, P (Eds) (2003) Housing Policy and Practice in Post-Apartheid South Africa Johannesburg: Heinemann Publishers.

Knipe, A., Van Deer Waldt, A., Van Niekerk, D., Burger, D. & Nell, K. 2002 Project Management for Success. Cape Town: Heinemann Kwok-key, N.G.2009.Impact of outsourcing in handling of water seepage complaints, University of Hong Kong. China.

Lam, E.S.2009.Water seepage problems in multi-story buildings, American Society of civil engineers. New York. National Sleep Foundation 2013 Shift work and sleep.www.sleepfoundation.org.[10September 2013]

Ndikokubwayo, R. 2012. Influence of procurement method on the occurrence of rework in construction projects. Unpublished Master’s thesis, Cape Peninsula University of Technology, Cape Tow

Niagara, P, Datche, E (2015). Factors Affecting the Performance of Construction Projects: A Survey of Construction Projects in the Coastal Region of Kenya. International Journal of Scientific and Research Publications, Volume 5, Issue 10, October 2015 1 ISSN 2250-3153

Meeampol, S, & Ogunlana, S. O. (2006) Factors affecting cost and time performance on highway construction projects: evidence from Thailand. Journal of Financial Management of Property and Construction, 11(1), 3-20. http://dx.doi.org/ 10.1108/13664380680001076

Mertens, D. A. (2010) Research and evaluation in education and psychology (3rd Ed) Thousand Oaks, CA: Sage.

Padilla, E.M. and Carr, R.I.: Resource Strategies for Dynamic Project Management, Journal of Construction Engineering and Management 117 (2) (1991), pp. 279-293.

Singh Y.K., Nat R. (2010), Research Methodology, APH

Understanding Cement (n.d)

Venter R 2011 Projects Resource Management 4th Ed New Jersey: Pearson Prentice Hall

Welman, C., Kruger, F. & Mitchell, B 2005.Research Methodology South Africa: Oxford University Press

Downloads

Published

2015-07-01

How to Cite

Fore, S. (2015). AN ANALYSIS OF FACTORS INFLUENCING THE QUALITY OF HOUSING CONSTRUCTION PROJECTS IN THE WESTERN CAPE, SOUTH AFRICA. MATTER: International Journal of Science and Technology, 1(1), 195–211. https://doi.org/10.20319/mijst.2016.s11.195211